Land filling is an important step before constructionDetached House For Sale of buildings or developmentLand For Sale to suit the intended use. However, in many cases, landowners may need to fill the land higher than adjacent land or even higher than the public road level to prevent flooding problems or to prepare the area for future construction. This raises questions that many people wonder about whether such land filling is allowed and what legal considerations or precautions exist.

Although Thai law does not directly prohibit filling land higher than the surrounding area, such actions must consider the potential impacts on neighboring land, drainage systems, and the use of public roads. If the land filling causes water to flow into others' property, soil erosion, or damage to neighbors' property, the landowner may be legally liable and it could lead to avoidable disputes if proper planning is done from the start.

Moreover, land filling is related to several laws, including building control laws, the Civil and Commercial Code, town planning laws, as well as local administrative organization ordinances. Each area may have additional regulations regarding filling levels, drainage systems, or prevention of impacts on surrounding areas. Those planning land development should study this information before starting the process.

This article 9Asset will help understand whether filling land higher than adjacent land and public roads is permissible, what laws are involved, what impacts should be cautious of, and how landowners should prepare to ensure the land filling is done correctly, safely, and reduces the chance of future problems with neighbors.


Is it possible to fill the land higher than the adjacent land and the public road?

The answer is that it can be done, but it must be under the law and must not cause any impact on others. Although Thai law does not directly prohibit filling land higher than adjacent land or public roads, the landowner still has the duty to act appropriately and be responsible for any potential impacts.

What landowners should know are as follows

  • You can fill the land higher than the adjacent area if it does not violate laws or local authority regulations.

  • Filling the land must not cause rainwater or surface water to flow into neighboring land causing damage, as the landowner may be liable for any damages caused.

  • If the filling is very high, a sufficient drainage system should be designed to prevent waterlogging, overflow, or drainage into adjacent areas.

  • In areas with significant elevation differences, it may be necessary to build retaining walls or soil protection structures to maintain stability and reduce risks to others' property.

  • Before filling, you should check the municipal or local administrative regulations, as some areas may have requirements regarding fill levels, drainage, or additional permits.

  • You should not rely solely on the current level of public roads because in the future, government agencies may raise the road level, which could affect the land's elevation.

  • For large construction projects or when filling land significantly higher than surrounding areas, it is advisable to consult engineers or experts to properly design the land level, drainage system, and soil protection structures.

  • Notifying or discussing with neighboring landowners before starting work, although not legally required in all cases, is a good practice to reduce misunderstandings and prevent disputes.

In summary, filling land higher than adjacent land and public roads is possible, but it must be done considering the impact on surrounding areas, with appropriate drainage systems, compliance with local regulations, and without causing damage to others, to ensure proper land development and reduce the risk of future disputes.


What laws are related to land filling?

Although land filling is the right of the landowner to utilize their property, such actions must comply with relevant laws and regulations to prevent impacts on neighbors, public areas, or the environment. Studying the legal provisions before starting land filling is important to reduce the risk of disputes and legal problems in the future.

Building Control Act

If land filling is part of preparing the site for building construction, the landowner should verify that the operation complies with the Building Control Act, especially regarding ground levels, drainage systems, and construction safety standards.

Civil and Commercial Code

Although the landowner has the right to use their property, the law stipulates that such use must not cause damage to others. If land filling causes water to flow into neighboring land, soil erosion, or damage to neighbors' property, the landowner may be liable to compensate for damages according to the law.

Local Administrative Organization Ordinances

Municipalities, Subdistrict Administrative Organizations, or local administrative bodies in each area may have additional regulations regarding land filling, such as height levels, drainage systems, or measures to prevent impacts on adjacent areas. Therefore, it is advisable to consult the responsible agency before starting the operation.

Town Planning Law

Land use in each area may be subject to the provisions of the master plan, which affects land development and building construction. Checking the type of land use before land filling helps ensure that the operation complies with the law.

Environmental and Water Management Laws

In some cases, if land filling may affect public waterways, drainage systems, or the surrounding environment, the landowner may need to comply with additional laws or regulations to prevent impacts on the surrounding area.

Regulations on Public Roads and Utilities

For land adjacent to public roads, care should be taken to ensure that land filling does not affect road levels, drainage, shoulders, or utilities, as this may impact public use and lead to orders for correction from government agencies.

Drainage System Design

Although many laws do not directly specify land filling levels, drainage systems are an essential component that landowners should plan from the beginning to prevent flooding, waterlogging, and water flow to neighboring land, which are major causes of disputes between landowners.

Land filling considerations involve not only the height level of the area but also various laws including building control laws, civil laws, town planning, and local regulations. Studying the laws and careful planning before starting land filling will help ensure proper land development, reduce the risk of disputes, and provide long-term confidence.

Read other interesting articles:Building a house on your own land: What do you need to know? Including 9 house construction laws you must not miss before starting.


How does filling the land too high affect the neighbors?

Filling land to be higher than the surrounding area may help reduce the risk of flooding and prepare the site for construction. However, if done without considering the environment and drainage systems, it can impact neighboring land and lead to disputes between landowners. Therefore, before starting land filling, the impacts in various aspects should be considered, not just the benefits to one's own land.

1. Water flows into the neighbor's land

The most common problem is when rainwater cannot seep into the elevated filled area, water will flow down to lower areas. Without a proper drainage system, this may cause waterlogging, flooding, or damage to the houses and properties of neighboring landowners.

2. Soil erosion and topsoil flowing into adjacent areas

Filling land at a very high level without supporting structures may cause topsoil erosion during heavy rain, resulting in soil flowing into neighboring land, public roads, or drainage channels, which can cause damage and increase repair costs.

3. Neighbor's fence walls or buildings are affected

The increased soil pressure after filling may affect fence walls, foundations, or buildings adjacent to the boundary. Without proper retaining wall design or supporting structures, walls may crack, tilt, or settle.

4. Public drainage system operates inefficiently

If land filling raises the ground level without designing drainage directions, rainwater may flow into drainage channels in volumes exceeding system capacity, causing overflow, flooding, or affecting public areas and surrounding communities.

5. Impact on public road levels and access

If the land level is much higher than the road, access may become difficult. It is necessary to design ramps or further adjust the area level. Additionally, if public roads are elevated in the future, it may affect land use and drainage systems.

6. Disputes between landowners

Impacts from land filling such as water flowing into houses, landslides, or property damage often cause disputes between neighbors. If no agreement is reached, local authorities may need to inspect or legal action may be taken to claim damages.

7. Increased costs for problem resolution later

Filling land without careful planning may require later improvements to drainage systems, construction of retaining walls, or repairs of damages, which usually cost more than proper design and execution from the start.


If it is necessary to fill the land to a higher level, how should it be done?

In some areas, land filling to a level higher than the original ground is unavoidable, such as low-lying areas prone to flooding, areas that need to be elevated to match surrounding projects, or areas prepared for building construction. However, filling soil to a high level should be carefully planned to prevent impacts on drainage systems and neighboring land. The guidelines that landowners should follow are as follows

Survey the original ground level and surrounding areas

Before starting to fill soil, the original land level, adjacent land levels, and public road levels should be surveyed to use as data for determining the appropriate filling level, including assessing the water flow direction in the area. Having accurate information from the beginning will greatly reduce problems that may arise after filling

Design an adequate drainage system

The drainage system is a crucial component of land development. If the area is filled higher, drainage channels, water retention ponds, or drainage pipes should be planned to efficiently handle rainfall to prevent water from flowing into others' land or causing waterlogging within the property

Construct retaining walls when there is a significant level difference

If the land level after filling is significantly higher than neighboring areas, consider building retaining walls or soil protection structures to withstand soil pressure, reduce the risk of subsidence, and prevent soil from sliding into surrounding areas, especially during the rainy season

Choose quality filling materials

The materials used for filling affect the long-term strength of the area. Materials should meet standards, be compacted in layers according to engineering principles, and avoid using materials mixed with waste or debris, as these may cause subsidence and affect building structures in the future

Allow time for soil settlement

After filling, most areas will naturally settle, especially when filling to a high level or using a large amount of soil. If there is a plan to construct buildings, allow sufficient time for soil settlement or use compaction and soil improvement methods as recommended by experts

Consult engineers or experts before starting

In cases where filling is much higher than surrounding areas or for large projects, consulting civil engineers or soil experts will help design appropriate ground levels, drainage systems, and soil protection structures, reducing safety risks and potential future problems

Check local authority regulations

Before filling, inquire with the municipality or local administrative organization about applicable regulations in the area, as some areas may have ordinances regarding filling levels, drainage systems, or additional permits. Complying with regulations from the start will ensure land development is legally correct

If it is necessary to fill land higher than surrounding areas The important thing is not just raising the soil level but planning comprehensively in engineering, drainage systems, and legal compliance Because good preparation from the beginning will reduce the risk of subsidence, prevent impacts on neighbors, and ensure safe and sustainable land use


What should be careful about when filling land adjacent to a public road?

Filling land adjacent to a public road involves more details to consider than filling land in general areas because it relates to the road level, drainage system, and long-term land use. If not properly planned, it may affect both land access, future construction, and potentially impact public areas.

Before starting land filling, the following key points should be checked

  • Check the current and future levels of the public road Do not refer only to the road level on the day filling begins because in the future, government agencies may have projects to raise the road level or improve the drainage system, which may cause the land level to be inconsistent with the area conditions later.

  • Plan the drainage system to adequately handle rainwater When the area is filled higher, rainwater will flow out of the area faster. Without proper drainage channels or retention ponds, water may flow onto the road or adjacent areas causing damage.

  • Check the land boundary before starting to fill the land The land boundary should be clearly surveyed to prevent filling land encroaching into the public road boundary or state property, which may cause legal problems later.

  • Design entrances and exits suitable for the land level If the land level is much higher than the road, the slope should be designed with an appropriate gradient to allow vehicles to enter and exit conveniently and safely, including supporting long-term use.

  • Do not block or change the direction of public water flow Land filling should not affect drainage ditches, drainage pipes, or public waterways because it may cause flooding problems in nearby areas and may require responsibility for the damages caused.

  • Allow space for public utilities The front area of the land may have water pipes, communication lines, drainage pipes, or other utility systems. Land filling should consider maintenance and not obstruct access for relevant agencies.

  • Consider the building floor level to correspond with the fill level If there are plans to build a house or building in the future, the building floor level should be planned together with the fill level to ensure good drainage, reduce the risk of backflow, and avoid additional costs for adjusting the land level.

  • Consult local authorities before proceeding In some areas, local administrative organizations may have regulations regarding land filling adjacent to public roads. Checking information before starting work will help ensure the process is correct and reduce the risk of having to make corrections later.

Filling land adjacent to public roads is not just about raising the land level but should be planned together with road levels, drainage systems, land boundaries, and future use.Because preparation in all aspects will help ensure land development is safelegal, and reduce problems that may arise in the long term.


If a neighbor fills the land to a high level causing damage, what should be done?

If a neighbor's land filling causes damage to your house, land, or property, you should not rush to take legal action immediately. Instead, the problem should be resolved step by step to find a mutual solution and reduce conflicts that may escalate. The recommended approach is as follows

  • Talk to your neighbor first Explain the problem straightforwardly, such as water flowing into the area, soil sliding, or damage to the wall, and work together to find a solution because many cases can be resolved without legal action

  • Record complete evidence of the damage Take photos or videos of the affected area, keep the date, time, and details of the incident, including documents or damage assessment reports. If you need to proceed with authorities or use as evidence in the future, this information will be very important

  • Check the cause of the problem You should have an expert or engineer assess whether the damage was caused by actual land filling or other factors, such as the area's original drainage system or natural soil conditions, to ensure proper resolution

  • Notify the local administrative organization to inspect If an agreement cannot be reached, you can notify the municipality, subdistrict administrative organization, or the responsible agency in the area to inspect the facts and provide advice on solving the problem according to local regulations

  • Consult an engineer or expert In cases where land filling is high enough to affect building structures, walls, or drainage systems, having an expert inspect will help identify the cause of the problem and propose appropriate solutions

  • Take legal action when no agreement can be reached If there is clear evidence that the neighbor's land filling caused damage and no agreement can be reached, the landowner can claim damages or take legal action. It is advisable to consult a lawyer or legal expert before proceeding

  • Prevent long-term problems together Even after the problem is resolved, both parties should plan together regarding drainage systems, retaining walls, or preventive measures for future impacts to avoid recurring problems during heavy rain or further development

If a neighbor's land filling affects your land or property, start by talking and finding a mutual solution, keep evidence, and involve authorities or experts to inspect when necessary. Systematic problem-solving will help reduce conflicts, maintain good neighborly relations, and properly protect the landowner's rights


Recommendations before deciding to fill land

Before starting land filling, plan and check all information thoroughly because preparing from the beginning will help reduce legal issues, costs, and disputes with neighbors in the future.

Before filling the soil, the following should be checked

  • Survey the levels of adjacent land and public roads before determining the soil filling level

  • Study the regulations of the municipality or local administrative organization

  • Design a drainage system that can adequately handle rainfall

  • Choose standard soil for filling and compact it properly

  • Construct retaining walls if the area has significant level differences

  • Allow time for soil settlement before building structures

  • Consult engineers or experts if it is a large-scale soil filling

  • Notify or talk with neighbors in advance to reduce misunderstandings and prevent disputes

In summary, good land filling is not just about raising the ground level but must consider laws, drainage systems, and impacts on surrounding areas simultaneously. Proper planning from the start will help ensure safe, correct use of the land and reduce potential problems in the future.



Summary: Land filling can be done higher than adjacent land and public roads, but legal regulations and impacts must be considered.

Filling land to be higher than adjacent land or public roads is not illegal if done correctly and considering the potential impact on the surrounding area. However, landowners should study the requirements of local authorities, plan drainage systems, choose standard fill materials, and design structures to prevent soil erosion when there is a significant level difference to prevent flooding, soil subsidence, and future disputes with neighbors.

Preparing before filling the land, from surveying the area, checking laws, and consulting experts, will help develop the land safely, reduce costs for fixing problems later, and fully utilize the land's potential in the long term.

If you are looking for land to build a house, develop a project, or invest in a location with potential, you can search for buying, selling, and rental listings on the website 9Asset, which gathers various types of real estate from across the country, along with location information, prices, and details that help you compare and decide on properties more easily.


FAQs about Is it allowed to fill your own land higher than the neighboring land and public road? What landowners should know before filling.

A: There is no universal number applicable to all areas because it depends on the previous flood level, the slope of the area, the drainage system, and future infrastructure development plans. Generally, engineers or experts should survey the area level before determining the fill level.


A: It can be done, but it is not recommended in areas with heavy rainfall because the soil may have high moisture content, compaction may not be fully effective, and there is a higher risk of subsidence or soil erosion compared to filling soil during the dry season.

A: The duration depends on the type of soil, the height of the fill, and the compaction method. For general soil filling, it may be necessary to wait for the soil to naturally settle for several months. However, if soil improvement and compaction are done according to engineering principles, the time can be reduced.

A: Generally, clean fill soil suitable for construction work is used, such as laterite soil or standard fill soil, which should be free from debris, organic materials, or waste to help reduce subsidence problems and increase the long-term stability of the area.

A: The history of land filling, compaction level, age of the filled soil, drainage system, subsidence condition of the area should be checked, as well as inspecting for any signs of cracks, waterlogging, or other issues that may affect future construction.

Recommended Properties

For SaleLand - 7,150,000 THB

ForSaleLand

7,150,000 THB

0-0-64 Rai
11 m.
25 m.

ขายที่ดินพร้อมอาคาร ทำเลทอง พหลโยธิน 34 แยก 11-6

เนื้อที่ดิน 64 ตร.ว. พื้นที่ใช้งานอาคาร 84 ตร.ม. -1 ห้องโถง -2 ห้องน้ำ เหมาะสำหรับ: อยู่อาศัย/โฮมออฟฟิศ/ลงทุน สถานที่ใกล้เคียง: -ร้าน 7-11 -โลตัส วังหิน -BTS เสนานิคม -มหาวิทยาลัยเกษตรศาสตร์ วิทยาเขตบางเขน -มหาวิทยาลัยศรีปทุม -เมเจอร์ ซีนีเพล็กซ์ รัชโยธิน -กรมพัฒนาที่ดิน -ธกศ. สำนักงานใหญ่ หากสนใจนัดชมสถานที่ หรือติดต่อสอบถาม: คุณเอื้อง ***.***.****

Google Map
Sena Nikhom Subdistrict, Chatuchak District, Bangkok, 10900309 M to BTS Kasertsart University (N13)
For SaleLand - 6,176,100 THB

ForSaleLand

6,176,100 THB

1-3-26 Rai
- m.
- m.

ขายที่ดินเปล่า ทำเลดี แม่ริม เชียงใหม่ ราคาต่ำกว่าตลาด ใกล้มหาวิทยาลัยแม่โจ้ วิวดอยสุเทพ

ขายที่ดินเปล่า ทำเลดี แม่ริม เชียงใหม่ ราคาต่ำกว่าตลาด ใกล้มหาวิทยาลัยแม่โจ้ วิวดอยสุเทพ ที่ตั้ง : ตำบลเหมืองแก้ว อำเภอแม่ริม จังหวัดเชียงใหม่ 50180 ขนาดเนื้อที่ : 1 ไร่ 3 งาน 26.6 ตารางวา รายละเอียด -โอกาสดีสำหรับผู้ที่กำลังมองหาที่ดินทำเลศักยภาพในจังหวัดเชียงใหม่ - เหมาะสำหรับสร้างบ้านพักอาศัย บ้านสวน โฮมออฟฟิศ คาเฟ่ หรือซื้อเก็บไว้เพื่อลงทุนในอนาคต -ทำเลอยู่ในแหล่งชุมชน เดินทางสะดวก -ใกล้สิ่งอำนวยความสะดวกครบครัน และราคาต่ำกว่าที่ดินในพื้นที่ใกล้เคียง จุดเด่นของที่ดิน -ที่ดินแปลงสวย รูปสี่เหลี่ยมคางหมู -หน้าที่ดินหันทางทิศเหนือ -ด้านทิศตะวันตกของแปลงสามารถมองเห็นวิวดอยสุเทพได้อย่างชัดเจน -ถนนหน้าแปลงกว้าง5เมตร -ไฟฟ้าและน้ำประปาพร้อมใช้งาน -บรรยากาศเงียบสงบ เป็นส่วนตัว -เดินทางเข้าเมืองเชียงใหม่และอำเภอแม่ริมได้สะดวก สถานที่สำคัญใกล้เคียง -ใกล้โครงการทางเลี่ยงเมืองแม่ริมเขตทางกว้าง 50 เมตร เพียง300 เมตร -ตลาดโซนเหลือง แม่โจ้ 1.8 กม. (5 นาที) มี KFC, Dairy Queen, Lotus's Go Fresh, Mr.DIY และศูนย์รวมร้านอาหารนานาชาติ -ตลาดสดแม่โจ้ 2 กม. (ประมาณ 5 นาที) -มหาวิทยาลัยแม่โจ้ 2.5 กม. (ประมาณ 5 นาที) -โรงพยาบาลสันทราย 5.5 กม. (ประมาณ 9 นาที) -เดอะ วัน วอเตอร์ ปาร์ค 6.3 กม. (ประมาณ 9 นาที) -สนามกอล์ฟกรีนวัลเล่ย์ 6.4 กม. (ประมาณ 10 นาที) -โลตัส แม่ริม 7.5 กม. (ประมาณ 13 นาที) -เดอะกาดฝรั่ง 7.5 กม. (12 นาที) มี Starbucks, Mr.DIY, สุกี้ตี๋น้อย, KFC, Pizza Hut, ชาบูกุ, Rimping และภัตตาคารอาหารจีน เจี่ยท้งเฮง -แม็คโคร แม่ริม 8.4 กม. (ประมาณ 13 นาที) -โรงพยาบาลนครพิงค์ 8.6 กม. (ประมาณ 15 นาที) -โรงพยาบาลดารารัศมี 9.6 กม. (ประมาณ 16 นาที) -เซ็นทรัลเฟสติวัล เชียงใหม่ 13 กม. (ประมาณ 23 นาที) -สนามบินนานาชาติเชียงใหม่ 25 กม. (ประมาณ 30 นาที) เพียง 8,500 บาท/ตารางวา ราคารวม 6,176,100 บาท ราคาต่ำกว่าราคาตลาดในพื้นที่ ติดต่อ คุณอัคเดช (เจ้าของแปลง) โทร. ๐๖๓-๙๙๒-๒๔๓๒ นัดชมที่ดินได้ทุกวัน #ขายที่ดินเชียงใหม่#ขายที่ดินแม่ริม#ที่ดินสร้างบ้าน#ที่ดินลงทุน#อสังหาริมทรัพย์เชียงใหม่

Google Map
Mueang Kaeo Subdistrict, Mae Rim District, Chiang Mai, 501802.0 km. to Maejo University
For Rent Land

ForRent Land

- THB

336-3-74 Rai
- m.
- m.

ให้เช่าที่ดินระยะยาว 336-3-74ไร่ เหมาะสำหรับสร้างโกดัง โรงงาน คลังสินค้า ชลบุรี

ให้เช่าที่ดินระยะยาว 336-3-74ไร่ เหมาะสำหรับสร้างโกดัง โรงงาน คลังสินค้า ชลบุรี เช่าเดือนละ 5,000ต่อไร่ ต่อเดือน ให้สัญญาเช่ายาวระยะ 30 ปี เหมาะสำหรับสร้างโกดัง โรงงาน คลังสินค้า ลานตู้คอนเทรนเนอร์ โรงแรม รีสอร์ทและสนามกอล์ฟและอื่นๆ รถใหญ่วิ่งสวนกันสบาย สถานที่ใกล้เคียง - ห่างโรบินสัน บ่อวิน 43 กิโลเมตร. - ห่างเมืองพัทยา 84 กิโลเมตร - ห่างนิคมอุตสาหกรรมอมตะซิตี้ระยอง 42 กิโลเมตร - ห่างนิคมอุตสาหกรรมแหลมฉบัง 63 กิโลเมตร - ห่างนิคมอุตสาหกรรมปิ่นทอง1 41 กิโลเมตร - ห่างนิคมอุตสาหกรรมสยามอิสเทิร์นซีบอร์ดระยอง 43 กิโลเมตร - ห่างโรจนะบ่อวิน 40 กิโลเมตร - ห่างท่าเรือแหลมฉบัง 65.5 กิโลเมตร - ห่างสนามบินสุวรรณภูมิ 106 กิโลเมตร ที่ตั้ง : ชลบุรี ------------------------------------------------------------------ #สนใจติดต่อ:#คุณเอส Line ID / โทร. *** - ******* ให้เช่าที่ดินชลบุรีch_ok#ขายโรงงานชลบุรี #บ้านดีบ้านสวยชลบุรี #ขายบ้านชลบุรีอมตะนิคมบางแสน

Google Map
Bo Win Subdistrict, Si Racha District, Chon Buri, 201101.2 km. to Lotus Bowin Shopping Mall
For Rent Land

ForRent Land

- THB

161-0-99 Rai
- m.
- m.

ให้เช่าที่ ดินแปลงใหญ่ 161 ไร่ พื้นที่สีเหลือง ศักยภาพสูง โซน Eastern Seaboard ระยอง

ให้เช่าที่ ดินแปลงใหญ่ 161 ไร่ พื้นที่สีเหลือง ศักยภาพสูง โซน Eastern Seaboard ระยอง ทำเล: โซนอุตสาหกรรม ใกล้นิคมในพื้นที่อีสเทิร์นซีบอร์ด ทำเลศักยภาพสูง ใกล้เส้นทางหลัก ขนส่งสะดวก เหมาะสำหรับ: - โกดังสินค้า / ศูนย์กระจายสินค้า - โรงงานอุตสาหกรรม - ลานจอดรถ / ลานตู้คอนเทนเนอร์ - โครงการพัฒนา / บ้านพักพนักงาน และอื่นๆ เงื่อนไขการเช่า: ราคาเช่าไร่ละ 35,000 บาท/เดือน (ราคาพิเศษสำหรับแปลงใหญ่) - สัญญาขั้นต่ำ 3 ปี (หรือมากกว่าตามตกลง) - เงินประกัน 3 เดือน - ค่าเช่าล่วงหน้า 1 เดือน ที่ตั้ง : ระยอง ------------------------------------------------------------------ #สนใจติดต่อ:#คุณเอส Line ID / โทร. *** - ******* #ให้เช่าที่ดินระยองpb #ขายโรงงานชลบุรี #บ้านดีบ้านสวยชลบุรี #ขายบ้านชลบุรีอมตะนิคมบางแสน

Google Map
Pluak Daeng Subdistrict, Pluak Daeng District, Rayong, 21140733 M to Pluak Daeng Hospital

Recommended Projects

ANA Itsaraphap

ANA Itsaraphap

186 Unit
Completed in 2030
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
Itsaraphap 15 Alley, Itsaraphap Road, Hiran Ruchi Subdistrict, Thon Buri District, Bangkok, 10600
Noble Emmerse Phrom Phong

Noble Emmerse Phrom Phong

358 Unit
Completed in 2029
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
Khlong Tan Subdistrict, Khlong Toei District, Bangkok, 10110
Tait Pattaya

Tait Pattaya

311 Unit
Completed in 2029
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
Central Pattaya Road, Pattaya City Subdistrict, Bang Lamung District, Chon Buri, 20150
InterContinental Residences Bangkok Asoke

InterContinental Residences Bangkok Asoke

88 Unit
Completed in 2029
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
Sukhumvit 16 Alley, Sukhumvit Road, Khlong Toei Subdistrict, Khlong Toei District, Bangkok, 10110
Avenue Boutique Condominium

Avenue Boutique Condominium

276 Unit
Completed in 2029
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
Bun Samphan Road Soi Buakhao 15 Nong Prue Subdistrict, Bang Lamung District, Chon Buri, 20150
Skypark Lucean Jomtien Pattaya

Skypark Lucean Jomtien Pattaya

899 Unit
Completed in 2029
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
66 Moo.12 Pattaya City Subdistrict, Bang Lamung District, Chon Buri, 20150
The Riviera California Pattaya

The Riviera California Pattaya

122 Unit
Completed in 2029
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
392/68 South Pattaya Road, Pattaya City Subdistrict, Bang Lamung District, Chon Buri, 20150
Once Wongamat

Once Wongamat

548 Unit
Completed in 2029
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
Naklua Soi 33, Naklua Road Na Kluea Subdistrict, Bang Lamung District, Chon Buri, 20150
WIDEN by Sansiri

WIDEN by Sansiri

215 Unit
Completed in 2028
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
8/11 Nang Linchi Road, Thung Maha Mek Subdistrict, Sathon District, Bangkok, 10120
MARQUIS Phayathai

MARQUIS Phayathai

380 Unit
Completed in 2028
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
Phaya Thai Road, Thung Phaya Thai Subdistrict, Ratchathewi District, Bangkok, 10400
Sea Spire Jomtien

Sea Spire Jomtien

451 Unit
Completed in 2028
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
299 Pattaya City Subdistrict, Bang Lamung District, Chon Buri, 20150
Beat Pop Ratchada-Kaset

Beat Pop Ratchada-Kaset

558 Unit
Completed in 2028
Sell
0 Listing
Rent
0 Listing

Start from - THB

Rent from - THB/month

No information

Google Map
Prasert Manukitch Road, Sena Nikhom Subdistrict, Chatuchak District, Bangkok, 10900